- Joined
- Aug 25, 2010
- Location
- doncaster
Norfolk City Council spent £1m building bat bridges over an A-road but the ungrateful bleeders have buggered off elsewhere leaving the embarrassed council to say "it's early days yet."
I wonder if the bats are just rebels and they are just crossing the road between cars or if the forgot to put a red and green bat symbol on the crossing point and they were sick of waiting.
The ungrateful bats also refused to use the bat tunnel as it was always flooded.
I wonder if the bats are just rebels and they are just crossing the road between cars or if the forgot to put a red and green bat symbol on the crossing point and they were sick of waiting.
The ungrateful bats also refused to use the bat tunnel as it was always flooded.
You do not have permission to view link
Log in or register now.
